Modern timber A-frame house in the forest
THE A-FRAME COMPANY · ARCHITECTURE IN HARMONY WITH NATURE

A-Frame houses in Bosnia and Herzegovina.

From idea to move-in.

DISCOVER MORE
0103
A HOME THAT BELONGS IN NATURE
Designed around you
Inspired by nature
Quality in every detail
From vision to your home
MORE THAN A HOUSE

Distinctive architecture.
Your place of peace.

Simple lines. The warmth of natural materials. Spaces that connect you with your surroundings. At The A-Frame Company, thoughtful design meets quality construction.

Meet The A-Frame Company
Timber staircase, loft, living room and kitchen inside an A-Frame house
ROOM FOR YOUR DREAMS

An iconic shape. Endless possibilities.

Explore Models
Front facade of the A-Frame Basic house with triangular glazing and a terrace

A-Frame Basic

55 m²
  • Living room
  • Kitchen
  • Bathroom
  • Sleeping loft
Shell construction22.000 €Duration: 30 days
Turnkey35.000 €Duration: 60 days

Displayed prices include the Standard material package. The Premium package is available at an additional cost.

Compare Material Packages
Request a quote
Visualization of the A-Frame Plus house with an additional side room

A-Frame Plus

70 m²
  • Living room
  • Kitchen
  • Bathroom
  • Bedroom
  • Loft
Shell construction28.000 €Duration: 30 days
Turnkey45.000 €Duration: 60 days

Displayed prices include the Standard material package. The Premium package is available at an additional cost.

Compare Material Packages
Request a quote

Learn more about our models, finishing options, and Standard and Premium material packages.

Explore Models in Detail

Prices do not include preparation of the foundation slab, which is provided by the investor. The final price is defined by contract.

YOUR HOME. YOUR CHOICE.

Construction tailored to you.

01

Shell construction

Structure and preparation of the home for finishing works. The scope is defined by the quote and contract. Duration: 30 days (Basic and Plus).

02

Turnkey construction

Complete construction through to move-in, with one contact person throughout. Duration: 60 days (Basic and Plus).

The investor is responsible for preparing the foundation slab.

WHY US

Fixed prices per model

A contract that defines everything

Clear timelines

Quality materials

FAQ

Answers to common questions.